How much does the BMR Follow-Up Concrete Placing Boom 12-20 m cost?
Investment in the Follow-Up Concrete Placing Boom 12-20 m is set by corporate quotation against edition choice, module and accessory configuration, quantity, site programme and delivery terms. For project-specific configuration and corporate pricing, request a quotation; we map the sourcing route and the commissioning and operator training schedule with you.
How is it sourced in Turkey?
We deliver BMR construction robots to site projects through enterprise supply, commissioning and engineering support. For the full technical breakdown see our Follow-Up Concrete Placing Boom 12-20 m product page.
Key technical figures
Maximum placing radius 12 / 15 / 18 / 20 m; minimum weight for floor-to-floor transfer 1.6-1.7 t (2.2 t) / 2.2 t / 2.5 t; maximum wind 13.8 m/s (force 6).
